Highlights:
| Hole | From (m)1 | To (m) | Interval (m)2 | Li2O (%)3 |
| YLP0001 | 73 | 108 | 35 | 1.30 |
| inc. | 75 | 102 | 27 | 1.58 |
| YLP0002 | 180 | 214 | 34 | 0.34 |
| YLP0003 | 55 | 94 | 39 | 1.43 |
| inc. | 57 | 92 | 35 | 1.57 |
| YLP0004 | 55 | 88 | 33 | 1.39 |
| inc. | 56 | 85 | 29 | 1.55 |
| YLP00054 | 52 | 131 | 79 | 1.13 |
| inc. | 73 | 129 | 56 | 1.42 |
1 From, to, and interval lengths in metres, as measured down core axis, not true width.
2 Individual sample lengths = 1 metre.
3 Lithium assays performed by ALS Global on saw cut half HQ core using method ME- ICP82b; results reported in Li%, converted to Li2O by multiplying by 2.154.
4 Drilled down-dip due to access restriction.
Francis MacDonald, CEO of LIFT comments, “We are very encouraged with these first drill results at the Yellowknife Lithium Project. The widths and grades of lithium and spodumene intersected in these holes are similar to what was historically reported in the 1950s to 1980s1. 8 different pegmatites will be drilled this summer with 45,000 metres of drilling that will utilize six drill rigs. We look forward to reporting additional results in the coming weeks and month. We believe that these initial drill results show that the YLP has excellent potential to become one of the next destinations in North America to define significant spodumene resources.”